NAM LEUK WATER PROOFING OF JOINTS PROJECT

SALIENT FEATURES:


Status: Completed
Client: EDL-Generation Public Company — (EDL-Gen)
Location: Vientiane Province, Lao PDR
Type of Contract: Green FIDIC type
Beginning of Construction: Jan 2013 
End of construction: May 2016
Construction period: 60 days

SCOPE OF WORK AND SUPPLY:
  • Waterproofing of the joints at the RCC spillway section of Nam Leuk dam
  • Installation of 80m of PVC geomembrane
  • Treatment at crossing joints/horizontal perimeter seals
  • Geomembrane manufactured by Carpi, Switzerland
  • Dam Auscultation
  • Maintenance equipment
    1. Carpitech membrane SIBELON
    2. Stainless steel fixation system