NAM LEUK WATER PROOFING OF JOINTS PROJECT
SALIENT FEATURES:
Status: Completed
Client: EDL-Generation Public Company — (EDL-Gen)
Location: Vientiane Province, Lao PDR
Type of Contract: Green FIDIC type
Beginning of Construction: Jan 2013
End of construction: May 2016
Construction period: 60 days
SCOPE OF WORK AND SUPPLY:
- Waterproofing of the joints at the RCC spillway section of Nam Leuk dam
- Installation of 80m of PVC geomembrane
- Treatment at crossing joints/horizontal perimeter seals
- Geomembrane manufactured by Carpi, Switzerland
- Dam Auscultation
- Maintenance equipment
- Carpitech membrane SIBELON
- Stainless steel fixation system