NAM MANG 3 PUMPING STATION

SALIENT FEATURES:


Status: In progress
Client: EDL-Generation Public Company — (EDL-Gen)
Location: Vientiane Province, Lao PDR
Type of Contract: Full EPC (Yellow FIDIC type)—Part of the Nam Mang 3 and Nam Leuk Production Increase Project (6.8M$)
Beginning of Construction: Nov 2015
End of construction: July 2016
Construction period: 9 months
Increase of power production by 2%

SCOPE OF WORK AND SUPPLY:
  • Engineering:
  • FS / detailed design / construction drawings.
  • Procurement:
  • Supply and installation of E&M Equipment.
  • Construction:
  • 22kV transmission line and transformer station (550m), 110kW automated Pumping station, 400m long pipeline.