NAM MANG 3 FUSEGATES® PROJECT

SALIENT FEATURES:


Status: Completed
Client: EDL-Generation Public Company — (EDL-Gen)
Location: Vientiane Province, Lao PDR
Type of Contract: Full EPC (Yellow FIDIC type)—Part of the Nam Mang 3 and Nam Leuk Production Increase Project (6.8M$)
Beginning of Construction: Nov 2015
End of construction: July 2016
Construction period: 9 months
Increase of FSL of 1.0m (+22% reservoir storage capa.)

SCOPE OF WORK AND SUPPLY:
  • Engineering:
  • FS / detailed design / construction drawings.
  • Procurement:
  • formworks and fusegates manufacturing.
  • Construction:
  • Civil work at main spillway, destruction and reconstruction of the auxiliary spillway, fusegates installation.