NAM LEUK FUSEGATES® PROJECT
SALIENT FEATURES:
Status: Completed
Client: EDL-Generation Public Company — (EDL-Gen)
Location: Vientiane Province, Lao PDR
Type of Contract: Full EPC (Yellow FIDIC type)
Beginning of Construction: Nov 2015
End of construction: July 2016
Construction period: 9 months
Increase of FSL of 1.1m (+17% reservoir storage capa.)
SCOPE OF WORK AND SUPPLY:
- Engineering: FS / detailed design / construction drawings.
- Procurement: formworks and fusegates manufacturing.
- Construction: Civil work at main spillway, destruction and reconstruction of the auxiliary spillway, fusegates installation.