SUPPLY AND INSTALLATION LOG BOOM AT NAM NGUM 1

SALIENT FEATURES:


Status: Completed
Client: EDL-Generation Public Company — (EDL-Gen)
Location: Vientiane Province, Lao PDR
Type of Contract: Full EPC (Yellow FIDIC type)
EPC Contract: 0142/EDL-Gen
Beginning of Construction: Jan 2014
End of construction: June 2014
Construction period: 6 months

SCOPE OF WORK AND SUPPLY:
Supply and Installation Log Boom
  • Supply
    1. Hybrid Rope No. 1+No.2 (diameter 65mm x 530m)
    2. Small rope for fix float diameter 6mm
    3. Nylon mesh diameter 4mm x 2m x 2.50m
    4. U-Bolt Clamp diameter 30mm (stainless steel)
    5. Orange Paint Balls 3.75 L/Galon
  • Installation
    1. Remove and Installation